Power |
Home | Electronics | Notes | Meetings | Subsystems | Search |
Muon power consumption page.htm
Outer tracker power consumption page.htm
Rich1&2 power consumption page.htm
Velo power consumption page.htm
Veto power consumption page.htm
An EDMS document describing the power needs for LHCb is available here: https://edms.cern.ch/cedar/plsql/doc.info?document_id=473770&version=last
Due to harmonics problems with the 1500 PCs of the PC farm in D1 and partially in D2, it has been decided to make a separation between the PCs and the front-end electronics by installing two different transformers.
Transformer 1: | All numbers are given in kW | |||
for the PC farm in D1 and D2 | ||||
Item | In cavern (detector area) | Counting house area | Remarks | |
Barracks D1 | ||||
Max. per PCs Rack | 10 | kW | The maximum power that can be cooled for each rack has been considered. | |
Max. number of racks | 50 | |||
In D1 barrack (PCs farm) | 500 | |||
Barrack D2 | ||||
Max. per PCs Rack | 10 | kW | ||
Max. number of PC racks | 10 | |||
Total for futur extension of PC farm | 100 | kW | For futur extension | |
Switches, ECS, SFC (3 rack rows) | 100 | kW | ||
In D2 barrack (ECS, Network) | 200 | |||
TOTAL | 0 | 700 | kW |
Transformer 2: | All numbers are given in kW | |||
for the F-E electronics in D3 and in the cavern (+ additional sub-systems) | ||||
Item | In cavern (detector area) | Counting house area | Remarks | |
Barracks A2 and B3 | ||||
Calorimeter | 0 | 45 | LVPS for "in-cavern" electronics are installed in the counting house area | |
Inner Tracker | 0 | 14 | " " | |
Trigger Tracker | 0 | 17 | " " | |
Muon | 0 | 44 | " " | |
OT | 0 | 30 | " " | |
Rich 1&2 | 0 | 14 | " " | |
VELO | 0 | 22 | " " | |
VETO | 0 | 3 | " " | |
Total | 0 | 188 | " " | |
Safety factor (errors) | 1.5 | 1.5 | ||
Total for the detectors | 0 | 282 | ||
30% safety margin for future extension | 30% | 30% | ||
Total for the detectors with margin | 0 | 366.6 | ||
DSS (1 rack) | 1 | |||
TFC + L0DU (3 racks) | 20 | |||
In barracks A2 and B3 (detectors) | 387.6 | |||
Barrack D2 | ||||
DSS (1 rack) | 1 | |||
Spare for futur detectors racks (10kW per rack) | 90 | For futur extension | ||
In D2 barrack | 91 | |||
General | ||||
Detector cooling racks (8*15kW) | 120 | |||
Gas (7 racks on platform near counting house, 4kW each) | 28 | |||
Magnet control MCS + MSS | 6 | |||
Sniffer system racks | 10 | |||
Cooling on the detector | 70 | |||
Pumps (for the VELO) | 10 | |||
TOTAL | 10 | 713 | = | 721 kW |