Power consumption:

Muon power consumption page.htm

Outer tracker power consumption page.htm

Rich1&2 power consumption page.htm

TT Power Consumption Page.htm

Velo power consumption page.htm

Veto power consumption page.htm

 

More information:

An EDMS document describing the power needs for LHCb is available here: https://edms.cern.ch/cedar/plsql/doc.info?document_id=473770&version=last

Total power consumption:

Due to harmonics problems with the 1500 PCs of the PC farm in D1 and partially in D2, it has been decided to make a separation between the PCs and the front-end electronics by installing two different transformers.

Transformer 1:   All numbers are given in kW    
for the PC farm in D1 and D2        
Item In cavern (detector area) Counting house area   Remarks
         
Barracks D1        
Max. per PCs Rack   10 kW The maximum power that can be cooled for each rack has been considered.
Max. number of racks   50    
         
In D1 barrack (PCs farm)   500    
         
Barrack D2        
Max. per PCs Rack   10 kW  
Max. number of PC racks   10    
Total for futur extension of PC farm   100 kW For futur extension
Switches, ECS, SFC (3 rack rows)   100 kW  
         
In D2 barrack (ECS, Network)   200    
         
TOTAL 0 700 kW  

 

Transformer 2:   All numbers are given in kW    
for the F-E electronics in D3 and in the cavern (+ additional sub-systems)      
Item In cavern (detector area) Counting house area   Remarks
         
Barracks A2 and B3        
Calorimeter 0 45   LVPS for "in-cavern" electronics are installed in the counting house area
Inner Tracker 0 14                 "                  "
Trigger Tracker 0 17                 "                  "
Muon 0 44                 "                  "
OT 0 30                 "                  "
Rich 1&2 0 14                 "                  "
VELO 0 22                 "                  "
VETO 0 3                 "                  "
         
Total 0 188                 "                  "
Safety factor (errors) 1.5 1.5    
Total for the detectors 0 282    
30% safety margin for future extension 30% 30%    
Total for the detectors with margin 0 366.6    
         
         
DSS (1 rack)   1    
TFC + L0DU (3 racks)   20    
         
In barracks A2 and B3 (detectors)   387.6    
         
         
Barrack D2        
DSS (1 rack)   1    
Spare for futur detectors racks (10kW per rack)   90   For futur extension
         
In D2 barrack   91    
         
General        
Detector cooling racks (8*15kW)   120    
Gas (7 racks on platform near counting house, 4kW each)   28    
Magnet control MCS + MSS   6    
Sniffer system racks   10    
Cooling on the detector    70    
Pumps (for the VELO) 10      
         
TOTAL 10 713 = 721 kW

 