In the cavern the racks and their equipment (turbines, low voltage power supplies, electronics, etc.) have to stand to radiation and magnetic field. This is the reason why turbine units with magnetic shields have to be installed in those racks. When the shielding parts are mounted on the turbines motors, the system works up to 1 kGauss. The rack monitoring and control electronics integrated in the turbine units is based on an ELMB and is rad. tol.
The fans have shown not to stand in a magnetic environment above 40
Gauss. In the LHCb cavern, it will not be possible to use fan trays or
single fans.
Since the fan trays cannot be used, the cooling system is reduced to
turbines, heat exchangers and air deflector. With such a reduced system, the
total power dissipated within a rack cannot be above 4kW. For more
information about the tests that have been made with this configuration see
the rack cooling tests report:
http://ess.web.cern.ch/ESS/rackCoolingProject/index.htm
Racks and crates layout in the cavern for each sub detectors:
Sub detectors | Document type | Link to the document | Author | Type of racks | Number of racks | Layout |
Calorimeter | Presentation | O. Callot | 2m high (3 crates), limited space (small depth...) | ECAL + Prs : 8
racks (4 each side) HCAL : 2 racks (1 each side |
page 6-8 ,10 of the presentation | |
Muon 2 to 5 | Presentation | Muon system support structures | B. Schmidt | Std 56 U (2.58m) | 10-12 Electronics, 4 Gas | page 5 of the presentation |
Velo | web page | Rack distribution on the balcony | PROPOSAL | Std 52U / CERN store: 06.61.77.200.5 | 1 (Proposal) | |
Rich1 | web page | Rack distribution on the balcony | PROPOSAL | Std 52U / CERN store: 06.61.77.200.5 | 1 (Proposal) | |
PUS | web page | Rack distribution on the balcony | PROPOSAL | Std 52U / CERN store: 06.61.77.200.5 | 1 (Proposal) | |
Trigger Tracker | web page | Rack distribution on the balcony | PROPOSAL | Std 52U / CERN store: 06.61.77.200.5 | 1 (Proposal) | |
Rich2 | web page | Rack distribution in the concrete tunnel | PROPOSAL | Std 41U / CERN store: 06.61.77.100.8 | 2 (Proposal) | |
Outer Tracker | web page | Rack distribution in the concrete tunnel | PROPOSAL | Std 41U / CERN store: 06.61.77.100.8 | 2 (Proposal) | |
Inner Tracker | web page | Rack distribution in the concrete tunnel | PROPOSAL | Std 41U / CERN store: 06.61.77.100.8 | 2 (Proposal) | |
Muon 1 | web page | Rack distribution in the concrete tunnel | PROPOSAL | Std 41U / CERN store: 06.61.77.100.8 | 2 (Proposal) |